Over the past 23 years, Mr. Betzner has played a key role in many technically challenging projects, including the following recent assignments:



Pennypack Creek Watershed Project
Production lead- project manager. A forty square mile, two foot accuracy contour map for eleven municipalities in Bucks & Montgomery Counties falling within the Pennypack Creek Watershed. 

 Fort Washington/Ambler, PA. Watershed Study
Twenty five square mile mapping project abutting the Pennypack Creek Watershed Mapping Project. Data will be used in all planning aspects within the covered region. Primary focus of the project is new FEMA certified flood plain maps.

Brooklyn Bridge Park
High visibility project under taken for NYC Planning Commission. The project feature list contained over one hundred forty separate layers. This project was used for the planning of recreation areas along the East River.

 New Croton Aqueduct
This project involved large scale mapping for twenty nine aboveground point of entry sites into the Aqueduct. The Aqueduct which provides New York City with 15% of its water in April through November is shut down December through March. While performing the photogrammetric mapping an underground Survey is taking place simultaneously. 

Immaculata College
This one foot study covered over five hundred acres and was used for the planning of new campus facilities. Project completion date 02-2005.

Province of Neuquen, Argentina
Served as production manager for international photogrammetric and cadastral mapping project estimated at $2.5 million. Created batch processes, macros, and production workbook. Coordinated all project activities through quality control, digital edit, and into GIS processing phase.

San Juan, Puerto Rico
Large 1:1000 scale mapping project covering the Old San Juan district. Mr. Betzner as   production lead was responsible for the quality control aspect of the digital mapping product ensuring seamless connectivity over the entire data set. Mr. Betzner was also directing involved in the initial procurement phases of the project.

US Naval Military Installations, Japan
Mr. Betzner served as production lead on this unclassified project. Over ten bases were mapped at 1”=20’scale with a 0.5 contour interval. This project consisted of over 120 separate GIS layers. The terrain component on this project was one of the difficult aspects of the project and various QC measures we implemented to insure a quality topographic data set.

Bell Atlantic
As lead compiler was responsible for creating innovative time saving techniques that were employed during the production effort to keep the project on time and within budget.

Lower Colorado River Authority (LCRA)
Lead compiler, technical support for the topographic mapping (4 foot contour interval) and digital orthophotography in support of mapping the Colorado River Basin from San Saba to Matagorda, a distance of approximately 250 linear miles.

Lancaster County, PA
Production lead - initial mapping project in 1993; land base updating services in 1998 - 2000.  The original 1,000 square mile area was flown at 1” = 1600’ for production 1" = 200' GIS land base mapping.  BAE SYSTEMS ADR produced five (5’) foot contours using DEM processing.  All data was delivered in ARC/INFO Librarian format adhering to the County’s detailed data base design.

Camden to Trenton Rail Line
Served as production and compilation manager for rail line mapping project. Created batch processes, macros, and production workbook. Coordinated all project activities through digital edit and into GIS processing.

 New Croton Aqueduct
This project involved large scale mapping for twenty nine aboveground point of entry sites into the Aqueduct. The Aqueduct which provides New York City with 15% of its water in April through November is shut down December through March. While performing the photogrammetric mapping an underground Survey is taking place simultaneously. 

Immaculata College
This one foot study covered over five hundred acres and was used for the planning of new campus facilities. Project completion date 02-2005.

Province of Neuquen, Argentina
Served as production manager for international photogrammetric and cadastral mapping project estimated at $2.5 million. Created batch processes, macros, and production workbook. Coordinated all project activities through quality control, digital edit, and into GIS processing phase.

San Juan, Puerto Rico
Large 1:1000 scale mapping project covering the Old San Juan district. Mr. Betzner as   production lead was responsible for the quality control aspect of the digital mapping product ensuring seamless connectivity over the entire data set. Mr. Betzner was also directing involved in the initial procurement phases of the project.

US Naval Military Installations, Japan
Mr. Betzner served as production lead on this unclassified project. Over ten bases were mapped at 1”=20’scale with a 0.5 contour interval. This project consisted of over 120 separate GIS layers. The terrain component on this project was one of the difficult aspects of the project and various QC measures we implemented to insure a quality topographic data set.

Bell Atlantic
As lead compiler was responsible for creating innovative time saving techniques that were employed during the production effort to keep the project on time and within budget.

Lower Colorado River Authority (LCRA)
Lead compiler, technical support for the topographic mapping (4 foot contour interval) and digital orthophotography in support of mapping the Colorado River Basin from San Saba to Matagorda, a distance of approximately 250 linear miles.

Lancaster County, PA
Production lead - initial mapping project in 1993; land base updating services in 1998 - 2000.  The original 1,000 square mile area was flown at 1” = 1600’ for production 1" = 200' GIS land base mapping.  BAE SYSTEMS ADR produced five (5’) foot contours using DEM processing.  All data was delivered in ARC/INFO Librarian format adhering to the County’s detailed data base design.

Camden to Trenton Rail Line
Served as production and compilation manager for rail line mapping project. Created batch processes, macros, and production workbook. Coordinated all project activities through digital edit and into GIS processing.



 


 